Engineering CAD drawing

Elevator project management features.

Controls for the numbers that reach the shop.

Build It Track It launches in Q3 2026. Its controls tie each BOM line, site survey, signed contract, and drawing revision to the cab job that depends on it.

One Cab Job, One Record

Your estimate, drawing revisions, project email, attachments, and signed contract stay with the cab job. Purchasing and final closeout are planned for the Q3 2026 launch.

Live cab job1 of 3 handoffs
Stage 1Estimating & BOM
Stage 4Engineering
Stage 4Final for Record

The estimating decision stays attached when the approved drawing moves to the next handoff.

The BOM Shows Every Scope Change

Your estimator enters each BOM line. A standard line resolves cost and labour from an approved rate-library item. A custom line cannot be sent without a named vendor and attached quote.

Drawing revisions and change orders remain with the job. Final for Record makes the approved drawing immutable, and the estimator can preserve the completed line-item estimate as the final snapshot.

Estimate · EC-2024-089Original scope
Original Spec$12,450
Change Order: Custom Panels+$2,100
Final estimate ready$14,550

The change-order amount stays beside the revision until approval.

A Signed PDF You Can Verify

Your customer should not need a staff account to sign the contract.

The contract flow uses a secure link, records consent, and produces a locked signed PDF. Its stored hash lets you check that document for alteration.

Contract releaseStep 1 of 3

Document ready

Secure signing link opened

Secure contract signing

The project keeps the locked signed PDF and the hash used to verify it.

No Custom BOM Line Without a Quote

Standard lines: Your estimator selects an approved rate-library item. The entered quantity resolves its material cost and labour hours.

Custom lines: Your estimator names the vendor and attaches the quote before sending. When the estimate is complete, its line items can be preserved as the final snapshot.

Estimate controlStandard lines resolved
Estimate completion70%
Rate library checkedOK

Standard items resolved approved cost and labour hours.

A standard line needs an approved rate-library item. A custom line needs a vendor quote before sending.

Product questions

What happens when the handoff is not clean.

A missing vendor quote, unsigned contract, or superseded drawing can stop a cab job. These answers show which record and approval control the next move.

Does the e-signature engine cost extra?

The platform includes native contract signing — no separate per-envelope account required. The signed PDF is locked and verified against its stored document hash. Production-release approvals and final-acceptance workflows are planned for the Q3 2026 launch and are not available today.

What purchasing controls are planned for launch?

Purchase-order records and material receipt are planned for the Q3 2026 launch. Purchasing is not available today. Automatic PO drafting, automatic budget enforcement, an inventory ledger, low-stock alerts, and vendor-delay warnings are not current capabilities.

Can I use my existing accounting software?

Build It Track It does not currently connect to accounting software or an ERP. Deposit and final-payment milestones are planned for the Q3 2026 launch, while accounting remains in the system your business already uses.

How does the system handle engineering revisions?

Engineering stores each uploaded PDF, DXF, or DWG as a revision, keeps revision history and change orders with the job, and can apply an immutable Final for Record lock. The platform stores these files; it does not parse or generate CAD data. Purchasing is planned for the Q3 2026 launch.

What is the difference between the BOM and the Final Estimate?

The estimator enters each BOM line. Standard lines resolve material cost and labour hours from an approved rate-library item; custom lines require a vendor and attached quote before sending. The platform performs the arithmetic, and the estimator can preserve the completed line-item result as a final estimate snapshot.

When will production scheduling be available?

Production and delivery-date scheduling are planned for the Q3 2026 launch and are not available today. A live capacity calendar, station man-hour tracking, vendor-delay warnings, and automatic delay-risk calculations are not current capabilities.

What does 'Final for Record' mean?

'Final for Record' is the immutable lock state for the approved engineering revision. The uploaded drawing file and its revision history remain stored with the job and cannot be changed after locking. Purchasing and production handoffs are planned for the Q3 2026 launch.

How does the survey stage feed into estimating?

An assigned surveyor uses a secure, expiring link to capture required dimensions, photos, and field notes against the project. The estimator can review that project information while entering BOM lines; the platform does not automatically generate or revise a BOM from survey data.

See where cab time goes: estimating, approval, fabrication, or delivery.

Request a Walkthrough