Estimator
Carries assumptions, BOM lines, material rates, labour hours, and vendor quotes into a traceable commercial baseline.
One controlled record from quote to signoff.
Elevator cab project management software controls the job record from lead and estimate through survey, engineering, material handoffs, production, installation, and signoff. It differs from generic project management by connecting elevator cab drawings, the bill of materials, price changes, approvals, and field evidence to explicit release gates rather than loose tasks.
A generic tracker knows that a task is open or complete. An elevator project management system has to know which car, survey, quote, bill of materials, drawing revision, customer decision, and field record made that status true. The difference is not a dashboard skin; it is the data model and the rules between departments.
Cab jobs change as field conditions and drawing comments become known. Software must preserve the quoted baseline, connect a revised drawing to its commercial effect, and identify Final for Record before downstream commitment. See the detailed elevator submittal and drawing approval process and the cab estimating method.
Build It Track It, built by Genesis Digital Corp., is pre-launch and scheduled for Q3 2026. The working product today contains a twelve-stage pipeline and job record, role-based access, secure-link survey assignment, project email, communications and attachments, contract e-signature with a locked hash-verified PDF, engineering revision control with change orders and Final for Record, and person-entered BOM estimating backed by an approved rate library with vendor quotes required for custom lines.
Elevator PM software means elevator project management software; buyers commonly abbreviate project management to PM. The abbreviation does not mean preventive maintenance in this buying context. Elevator PM software for cab projects coordinates the people and evidence required to move a custom job from opportunity to accepted installation.
Useful elevator job tracking software answers more than “where is the job?” It answers what scope is approved, which revision governs, what changed the price, who owns the next decision, and what evidence permits the next handoff. The Build It Track It platform workflow shows how those answers fit one record.
A stage is a gate, not a coloured status. Work can overlap, but a downstream commitment should not outrun its source evidence. Build It Track It has the twelve-stage pipeline today; the cards state which controls are working now and which evidence-gated handoffs are planned for the Q3 2026 launch but not yet available.
Capture the customer, building, cars, requested scope, bid documents, due date, owner, and next action. Do not advance until the opportunity has enough information to estimate and its assumptions are visible.
Build a person-entered bill of materials, labour basis, vendor-quoted custom lines, allowances, exclusions, and quote. The handoff must preserve the exact scope and rate basis behind the issued price.
Assign the survey securely and collect required dimensions, existing conditions, access notes, and photographs against the correct job and car. Missing evidence must remain an open exception, not become an engineering assumption.
Reconcile the accepted proposal with the governing agreement, then capture consent and signature. The signed PDF must be locked and retained with the project record before contractual work proceeds.
Store every issued drawing revision, its comments, author, and status. A scope-affecting revision must create a visible change-order decision, and Final for Record must identify the only controlled production basis.
Compare approved engineering with the quoted bill of materials and labour. Price additions and credits, preserve approval, and prevent an unapproved commercial delta from disappearing into the shop package.
At launch, this planned gate will record whether the contractual release condition has been met before a production commitment is treated as firm. The deposit gate is not available today.
At launch, this planned stage will source from the Final for Record bill of materials, check quote validity and budget, and distinguish stock from ordered material. Purchasing, purchase orders, and inventory are not available today.
At launch, this planned stage will match receipts to ordered lines and record quantity, damage, shortages, location, and recovery ownership. The receiving workflow and inventory ledger are not available today.
At launch, this planned stage will load approved hours by station only when drawings and material are ready, then expose conflicts before promises are made. Capacity planning, production scheduling, and delivery-date scheduling are not available today.
At launch, this planned stage will give the installer current job context and preserve required photos, notes, exceptions, and completion evidence against the job. The evidence-gated installation handoff is not available today.
At launch, this planned stage will track deficiencies, walkthrough, acceptance, and final commercial status, with required evidence controlling closeout. The evidence-gated closeout and final signoff workflow is not available today.
For owners, exit conditions, and common failure modes at every gate, use the twelve stages of an elevator cab project.
All three can display a job list. The practical test is whether the record carries controlled elevator cab facts across a handoff without relying on memory, a side email, or a separately maintained file.
| Control | Generic project management | Spreadsheets | Elevator-specific software |
|---|---|---|---|
| Drawing revision control | Files and approvals require configuration. | Revision status is typed manually; drawings live elsewhere. | Preserves revisions and identifies Final for Record. |
| Change-order pricing | Tasks can be linked, but pricing logic is custom. | Price deltas are reconciled across separate sheets and email. | Connects scope change, price decision, approval, and governing revision. |
| Bill of materials | Usually a list, attachment, or custom database. | Flexible, but rates and versions depend on manual discipline. | Keeps line-level material and labour basis in the job record. |
| Survey capture | Forms can be built and connected. | Dimensions and photos split across sheets, folders, and phones. | Assigns field capture to the cab job through controlled access. |
| Capacity | Resource views rarely understand shop stations without setup. | Hours and dates are manually maintained. | Should connect station hours, material readiness, and schedule; Build It Track It plans this for the Q3 2026 launch, but it is not available today. |
| Signoff evidence | Attachments can sit beside a completed task. | A checked cell does not prove acceptance. | Should require project-linked field and customer evidence; Build It Track It plans this closeout control for launch, but it is not available today. |
Read the direct comparison with spreadsheet job tracking before replacing a familiar tracker.
They fail when status and proof separate. A row can say “approved” while the attachment folder contains three revisions, the estimator prices another, and the installer has an older email. Generic software can be configured to reduce that risk, but the buyer then owns the schema, automations, permissions, testing, and long-term administration.
A missing dimension looks like a completed survey unless required captures and exceptions are part of the gate.
A drawing comment changes finish, quantity, or labour but never becomes a priced and approved change order.
A buyer receives a bill of materials without a reliable link to the Final for Record revision.
A promised delivery is treated as available stock, while shortages and damage remain in email or on a packing slip.
The installation package contains stale drawings, incomplete access notes, or no defined evidence checklist.
A task is checked complete while punch items, acceptance, and final commercial action are still open.
Ask vendors to demonstrate the difficult handoffs with a realistic cab change, not a clean task board. A useful evaluation checklist is specific enough to expose what is native, what requires configuration, and what exists only on a roadmap.
Carries assumptions, BOM lines, material rates, labour hours, and vendor quotes into a traceable commercial baseline.
Controls drawing revisions, records scope impact, routes change orders, and identifies Final for Record.
At launch, the planned purchasing stage will work from the approved bill of materials and revision before commitment; it is not available today.
At launch, planned capacity and production scheduling will connect released drawings, verified material, priorities, and station load; they are not available today.
At launch, the planned installation workflow will connect current job context, photographs, exceptions, and completion evidence; evidence gating is not available today.
Sees relevant survey, drawing, approval, and field information without gaining access to internal cost or unrelated projects.
Receives secure contract signature and the decisions or documents appropriate to the customer's project role.
Review the fuller role breakdown for elevator project teams, cab manufacturers, and elevator contractors.
AVAILABLE TODAY
Build It Track It has the twelve-stage project pipeline and job record, role-based access, secure-link survey assignments, project email, communications and attachments, contract e-signature with a locked hash-verified PDF, engineering drawing revisions, change orders, Final for Record, and estimating with a person-entered bill of materials today. Standard BOM lines resolve cost and labour from an approved rate-library item; custom lines require a vendor quote.
PLANNED FOR Q3 2026 LAUNCH
Deposit gating, purchasing and purchase orders, inventory and material receipt, capacity planning, production scheduling, delivery-date scheduling, installation evidence, and closeout signoff are planned for the Q3 2026 launch but are not available today. Accounting or ERP integrations remain later roadmap work. CabStudio is planned for 2027; Build It Track It currently has no cab configurator, automatic BOM generation, CAD engine, AI feature, or DXF/DWG import, parsing, or export beyond storing an uploaded drawing as an attachment.
The distinction matters because a roadmap describes intended direction, not a purchasing promise. Review Build It Track It features and phases and the separate CabStudio 2027 plan when evaluating fit.
Elevator cab project management software keeps the commercial, engineering, material, shop, field, and acceptance record for a cab job in one controlled workflow. Unlike a generic task manager, it models elevator-specific objects and gates such as the bill of materials, survey evidence, drawing revisions, change orders, Final for Record, installation evidence, and customer signoff.
Elevator PM software means elevator project management software; buyers commonly abbreviate project management to PM. In the elevator cab context, it should track the job from lead and estimate through survey, engineering, material readiness, production, installation, and final signoff rather than merely assigning tasks.
Generic project management software organizes tasks, dates, owners, and files, but the customer must design and maintain the elevator workflow. Elevator-specific software should understand drawing approval states, BOM lines, change-order pricing, survey capture, production release gates, and signoff evidence as connected parts of one job.
A spreadsheet can list jobs, dates, costs, and statuses, but it does not enforce who may release a revision or whether a required approval exists. Teams usually need email and file storage beside the spreadsheet, which separates the status from the evidence behind it. That separation is most dangerous at engineering, purchasing, production, and installation handoffs.
Look for a persistent job record, named stage owners, role-based access, required exit conditions, revision history, change-order pricing, a line-level bill of materials, secure field capture, communications and attachments, and closeout evidence. Also ask the vendor to distinguish capabilities available today from all-twelve-stage MVP controls planned for launch and later roadmap work such as accounting integration and CAD.
No. In the pre-launch Build It Track It estimating workflow, a person enters each BOM line. Standard lines resolve material cost and labour hours from an approved rate-library item, while custom lines require a vendor quote; automatic BOM generation from cab options, dimensions, drawings, or CAD is not a launch capability.
Build It Track It is pre-launch, with all twelve stages at MVP tier planned for Q3 2026. The working product today includes the twelve-stage job record, role-based access, secure survey assignment, project email, communications and attachments, contract e-signature with a locked hash-verified PDF, controlled drawing revisions and change orders, Final for Record, and person-entered BOM estimating with an approved rate library and vendor quotes for custom lines.
Purchasing and purchase orders, an inventory ledger, capacity planning, production scheduling, and delivery-date scheduling are planned for the Q3 2026 launch but are not available today. Accounting or ERP integrations remain later roadmap work. CabStudio, the planned CAD and 3D design capability, is on the 2027 roadmap; Build It Track It does not currently import, parse, or export DXF or DWG files.
Discuss the Q3 2026 launch scope and the roadmap against your actual elevator cab workflow.