Elevator contractor software must keep the field survey tied to the submittal, the current drawing, and the signed scope. Build It Track It gives the installing contractor, general contractor, and cab manufacturer controlled access to the same job without exposing another company’s private information.

Know which drawing governs before the crew arrives.

Build It Track It is pre-launch, with launch planned for Q3 2026. The working product already contains the twelve-stage job record and role-based access. It also contains secure survey assignments, project communications and attachments, contract e-signature, engineering drawing revision control, change orders, Final for Record, and manually built bill of materials estimating. Dedicated purchasing, capacity, production scheduling, and delivery-date scheduling are not live today.

What do elevator contractors need that generic construction software does not provide?

Generic construction project management software organizes work around RFIs, broad submittal logs, daily reports, and the building schedule. A cab package has a stricter chain. Field dimensions govern engineering. Approved engineering governs fabrication and installation. Elevator contractor software must preserve that chain instead of reducing it to a task called “cab submittal.”

The record must also separate a requested date from a supportable commitment. You can discuss cab lead time against the hoistway schedule. You cannot call it automatically calculated while purchasing, material receipt, shop capacity, and delivery scheduling remain disconnected. Credible elevator installation project management software must show that difference.

  1. REQUIREMENT 1

    Submittal and drawing revision identity

    You need to know which elevator cab drawing is current, which revision came back, what changed, and whether it is under review or locked Final for Record. A filename buried in an email thread is not revision control.

  2. REQUIREMENT 2

    Cab lead time against the hoistway schedule

    You need to compare the manufacturer’s stated lead-time basis with the date the hoistway, power, access, and preceding work will actually be ready. An early target is not a confirmed delivery date.

  3. REQUIREMENT 3

    Field dimensions before fabrication

    Survey measurements, photos, existing conditions, and unresolved exceptions must reach engineering before material is committed or the cab is fabricated. Each field fact needs the name of the person who captured it and the car it belongs to.

  4. REQUIREMENT 4

    Delivery coordination without false certainty

    Keep the site contact, access restriction, unloading responsibility, protection requirement, delivery window, and readiness decision with the job. Delivery coordination is a documented conversation. It is not delivery scheduling without a live scheduling function.

  5. REQUIREMENT 5

    Installation evidence at signoff

    Keep photos, exceptions, punch items, corrective work, and acceptance connected to the governing scope. The closeout record must show what the crew installed, what remains open, and who accepted completion.

“Elevator contractor” describes two different buyers

“Elevator contractor” may mean the licensed or specialist company installing, modernizing, and maintaining the equipment. It may also mean the general contractor buying and coordinating the package. Build It Track It uses role-based access because those parties touch the same job but should not see the same records.

The installing elevator contractor

This party supplies the field facts and performs the work at the elevator. Its view includes the assigned Stage 2: Field Survey information, project communications and attachments, the governing Stage 4 drawing package, and the installation requirements for that job.

A dedicated Stage 10: Installation and Field Evidence workflow and Stage 11: Closeout and Final Signoff sequence are planned capabilities, not live scheduling or signoff features today. Teams can currently attach files and discussion to the project. The dedicated installation evidence sequence remains planned.

The general contractor buying the package

This party deals with the commercial scope, signed agreement, submittal review, schedule-basis discussion, site access decision, and customer-facing communication. Stage 3 preserves the locked signed PDF. Stage 4 shows which drawing revision is current and whether it reached Final for Record.

The general contractor does not need the cab manufacturer’s rate library, material cost, labour hours, custom vendor quotes, or unrelated jobs. Those records stay with the manufacturer. The general contractor sees only the assigned project context its role requires.

See who uses each elevator project record and what each manufacturer, supplier, surveyor, installer, or customer contact can see.

Elevator-specific software shows which drawing governs

Spreadsheets can bend around a job. Generic construction systems can hold the building-wide record. Neither automatically identifies the field basis, commercial basis, current drawing, responsible party, and next controlled handoff for the cab. If you must reconstruct that answer from email, you do not have elevator submittal tracking software.

Comparison of generic construction project management software, spreadsheets and email, and elevator-specific software for common elevator contractor work.
Contractor painGeneric construction PMSpreadsheets and emailElevator-specific software
Field dimensionsMay store a survey attachment or issue, but usually does not organize the field capture around the elevator cab and car.Measurements can be copied into a sheet while photos remain on phones or in separate messages.Assigns Stage 2: Field Survey through a secure link and returns field information to the correct job record.
Drawing revision identityTracks a building submittal, but elevator-specific revision and release states may require custom configuration.Depends on filenames, manual logs, and everyone removing superseded attachments from circulation.Preserves Stage 4 revisions, change orders, approval state, and the Final for Record lock.
Cab scope and price changeCan log a change event, but may not connect it to the elevator cab bill of materials and drawing revision.A revised quote, spreadsheet, and marked drawing can drift into three different baselines.Connects the manually entered bill of materials, custom vendor quote where required, drawing change, and change order on the job.
Hoistway and cab datesShows the master schedule and coordination activities, but may not expose the evidence behind a cab commitment.A date is easy to enter and hard to qualify when survey, approval, material, or access changes.Should connect the schedule basis to elevator-stage evidence. Build It Track It does not yet calculate or schedule delivery dates.
Project accessPermissions are broad unless the account is carefully configured around the elevator package.Forwarding gives recipients copies that cannot be recalled when the record changes.Uses role-based access for assigned project records while keeping manufacturer costing and unrelated work private.
Installation and signoff evidenceCan hold daily reports, photos, and punch items, although the structure follows the whole building rather than the cab workflow.Photos, punch notes, correction evidence, and acceptance can remain in separate inboxes and devices.A dedicated evidence-to-signoff sequence is planned for Build It Track It; it is not a live workflow today.

For a deeper operational comparison, review elevator project software versus spreadsheets.

What is actually in Build It Track It today?

Build It Track It already models the job as a twelve-stage pipeline, while the product remains pre-launch. Current controls establish record identity and access. They also cover survey capture, contract execution, engineering revision control, communications, attachments, and estimating.

  • A twelve-stage pipeline keeps the elevator cab project identity intact from Lead Intake through Closeout and Final Signoff.
  • Stage 2: Field Survey can be assigned through a secure link so dimensions and field facts return to the correct job.
  • Stage 3: Contract and E-signature produces a locked signed PDF tied to the project record.
  • Stage 4: Engineering Drawings and Revisions preserves revisions, change orders, approval state, and a Final for Record lock.
  • Project communications and attachments keep decisions and supporting files with the job instead of a superintendent’s or project manager’s inbox.
  • Role-based access limits each participant to the projects and records appropriate to that participant.

What remains planned on the contractor workflow?

The twelve-stage model includes the later purchasing, receipt, shop, installation, and closeout handoffs because a cab job requires them. Their dedicated transaction and scheduling functions are not live simply because the stages have names.

Build It Track It does not currently provide purchase orders, an inventory ledger, capacity planning, production scheduling, or delivery-date scheduling. It also does not generate a bill of materials from options, dimensions, drawings, or CAD. A person enters every BOM line. Standard lines resolve approved material cost and labour hours from the rate library. Custom lines require a vendor quote.

Dedicated installation evidence and final signoff sequencing are planned. Until those controls ship, Build It Track It does not replace a contractor’s live dispatch, maintenance, accounting, ERP, purchasing, or delivery scheduling system. Review the current and planned feature boundaries before you choose it.

Elevator submittal tracking must answer which drawing governs

“Under review” does not tell you which drawing governs. You need the revision identifier, comments, field basis, scope effect, and responsible party. Stage 4 keeps drawing revisions and change orders together, then Final for Record locks the controlled drawing apart from every version still under review.

An uploaded drawing remains an attachment. Build It Track It does not parse DXF or DWG files and does not provide a CAD engine or 3D design tool today. Read the elevator submittal approval process for the review loop and release criteria.

Elevator installation project management starts before the crew arrives

The crew inherits every upstream miss. A missing field dimension, superseded drawing, unresolved change order, unconfirmed access route, or assumed delivery date becomes lost field time. The contractor record should connect the field survey, signed contract, governing drawing, and later field handoff before anyone arrives on site.

Build It Track It provides the upstream record controls and project communications today. The dedicated Stage 10 and Stage 11 field sequence is planned. The twelve stages of an elevator cab project explain each gate independently of product availability.

Frequently asked questions about elevator contractor software

What is elevator contractor software?

Elevator contractor software keeps surveys, contracts, submittals, drawing revisions, project communication, field records, and closeout decisions tied to the correct elevator job. It gives installing elevator contractors, general contractors, and elevator cab manufacturers controlled access to the parts of the record each party needs.

What software do elevator contractors use to track submittals?

Elevator contractors need software that identifies the current drawing revision, review status, comments, field basis, scope changes, and final release state. Build It Track It preserves engineering drawing revisions and change orders in Stage 4 and uses a Final for Record lock to identify the controlled drawing.

Can Build It Track It track elevator shop drawing approvals?

Yes. Build It Track It keeps drawing revisions, change orders, and approval state on the elevator cab job, and Final for Record locks the governing revision. Uploaded drawing files are stored as attachments; Build It Track It does not parse DXF or DWG files or provide a CAD engine.

How does elevator contractor software handle field dimensions?

Build It Track It can assign Stage 2: Field Survey through a secure link so measurements and field information return to the correct project record. Project communications and attachments keep supporting photos, notes, and exceptions with the job for engineering review before fabrication decisions are made.

Does Build It Track It schedule elevator cab deliveries?

No. Build It Track It does not currently provide delivery-date scheduling, production scheduling, capacity planning, purchasing, purchase orders, or an inventory ledger. Teams can keep delivery-related communication and attachments on the project, but that record should not be presented as an automatically calculated or confirmed delivery schedule.

Is Build It Track It software for elevator installers or general contractors?

Build It Track It is designed for both parties through role-based project access. The installing elevator contractor touches field survey information, governing drawings, project communication, and assigned field work, while the general contractor touches commercial scope, signed agreements, submittal decisions, schedule-basis discussions, and customer-facing records.

Does Build It Track It create an elevator cab bill of materials automatically?

No. A person enters every bill of materials line in Build It Track It. Standard lines resolve material cost and labour hours from an approved rate-library item, while custom lines require a vendor quote; no options, dimensions, drawings, or CAD files automatically generate the bill of materials.

Can elevator installers upload installation photos and collect final signoff?

A dedicated Stage 10: Installation and Field Evidence workflow and Stage 11: Closeout and Final Signoff sequence are planned, not live dedicated capabilities today. Current project communications and attachments can keep submitted files with the job, but Build It Track It should not yet be represented as a complete installation evidence or final acceptance system.

Carry the schedule. Control the cab package.

Review the twelve-stage Build It Track It workflow, or ask which Q3 2026 launch controls will help you answer the next schedule call with evidence.